EV Charging Station Installation

Electrical• Guanacaste & Nicoya Peninsula

Level 2 and DC fast-charge EV station installation for homes, condominiums, and commercial parking facilities.

Engineering Specifications & Guarantee

Built & Certified for Extreme Pacific Exposure

Precision-engineered to exceed ASTM, CFIA, and Costa Rican seismic codes, withstanding Guanacaste salt air, intense UV exposure, and hurricane-velocity winds.

US Standard Assurance

US-Standard 100% Accountability Guarantee

Covers dedicated circuit wiring, panel connection, and EVSE unit hardware.

Verified Coastal Protection Tier
🛡️5-Year Wiring & Charger Warranty
✓ASTM & CFIA Code Compliant
Specs & Warranty Schedule→
Level 2 Speed
7.2 kW to 19.2 kW (25-80 miles/hour charge)
DC Fast Charge
50 kW to 150 kW (200+ miles/hour)
Circuit
Dedicated 240V 40A to 100A Breaker
Smart Features
WiFi Monitoring, Scheduling & Load Balancing

Core Capabilities & Features

✓
Smart chargers schedule charging during off-peak low-cost hours
✓
Load-balancing software prevents panel overload
✓
Weatherproof NEMA 4X outdoor-rated enclosures
✓
Compatible with all J1772 and CCS standard EVs

Execution Process

01

Panel Assessment

Verifying available panel capacity for new circuit.

02

Circuit Wiring

Running conduit and dedicated 240V circuit to charger location.

03

EVSE Mounting

Wall-mounting charger with weatherproof conduit seal.

04

App Setup

Connecting smart charger to WiFi and configuring schedules.

Frequently Asked Questions

How long does it take to fully charge an electric car at home?

A Level 2 charger adds 25 miles of range per hour. A 300-mile battery pack charges fully in 8-10 hours overnight.

WhatsApp Direct Desk

Guanacaste Pacifico Construction

Direct Line: +506 6473-2556

Connect directly with our team for immediate consultations, pricing schedules, or site visits for EV Charging Station Installation in Guanacaste.

Send Us an Email Message

Guanacaste Pacifico Construction

Direct Line: +506 6473-2556