Panel Upgrades (200A/400A)

Electrical• Guanacaste & Nicoya Peninsula

Upgrading electrical breaker panels to 200A or 400A service with whole-house surge protection and sub-panel distribution.

Engineering Specifications & Guarantee

Built & Certified for Extreme Pacific Exposure

Precision-engineered to exceed ASTM, CFIA, and Costa Rican seismic codes, withstanding Guanacaste salt air, intense UV exposure, and hurricane-velocity winds.

US Standard Assurance

US-Standard 100% Accountability Guarantee

Covers panel bussing, breaker connections, grounding conductivity, and utility code compliance.

Verified Coastal Protection Tier
🛡️10-Year Electrical Workmanship Warranty
✓ASTM & CFIA Code Compliant
Specs & Warranty Schedule→
Panel Rating
Square D / Eaton NEMA 3R Outdoor Panels
Service Amperage
200 Amp Single Phase / 400 Amp Three Phase
Surge Protection
Whole-House 108,000 Amp Surge Device
Grounding Grid
Dual Copper Ground Rod Grid

Core Capabilities & Features

✓
Eliminates tripped breakers and overheating lines
✓
Provides breaker capacity for solar, EV chargers, and hot tubs
✓
Protects home electronics from lightning surge spikes
✓
Meets US National Electrical Code (NEC) standards

Execution Process

01

Utility Coordination

Coordinating main drop disconnect with electrical utility.

02

Old Panel Removal

Disconnecting legacy fuse boxes or undersized panels.

03

New Panel Mount

Mounting NEMA 3R enclosure and ground rods.

04

Circuit Wiring

Wiring individual circuits to AFCI/GFCI breakers.

Frequently Asked Questions

When is a 200A or 400A panel upgrade required?

Adding air conditioning, solar inverters, EV chargers, or square footage requires a panel upgrade to prevent power trips.

WhatsApp Direct Desk

Guanacaste Pacifico Construction

Direct Line: +506 6473-2556

Connect directly with our team for immediate consultations, pricing schedules, or site visits for Panel Upgrades (200A/400A) in Guanacaste.

Send Us an Email Message

Guanacaste Pacifico Construction

Direct Line: +506 6473-2556